Since 2010 the team have developed designs, and installation solutions for a vast range of floating systems and have been offshore to manage these installs.
Our Expertise
A floating system is complex and interconnected. Tadek naval architects, analysts and project engineers work to achieve optimised and comparative solutions for a range of scenarios of the complete system.
These are developed whilst considering the full life cycle, encompassing transport, assembly, tow out, operation, and survival.
Born from real-life experiences, the team enable investment decisions and proper assessment of project feasibility.
Floating System Modelling
Interconnected modelling and life cycle considerations for all floating plant.
FOW System Design
Model, assess, optimise, compare. Engineering depth for investment decisions.
FOW Mooring Design
Efficient, robust, installable mooring solutions. Cost modelling and technical excellence.
Dynamic Cable & Umbilical System Design
Proven and robust O&G solutions by industry professionals, optimised for FOW.
Floating System Installation Design
O&G and FOW project and site experiences, enhanced by nearly every MRE device install since 2010.
Floating System Modelling
As naval analysis engineers, we model hydrodynamic systems to assess overall capability under operational and extreme environmental conditions. We present the assessment of these systems in detailed design reports, sufficient for approval by third party approval and classification bodies. There are a number of stages in the modelling process:
- Basis of Design
- Hydrostatic Analysis
- Hydrodynamic Analysis
- Mooring System Modelling
- Cable/Umbilical System Modelling
- Installation & Operations
![Tadek-Services-FOW-Floating-Systems-Design-Floating-System-Modelling FOW Floating Systems Design, Floating System Modelling](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Services-FOW-Floating-Systems-Design-Floating-System-Modelling.jpg)
Floating System Modelling
As naval analysis engineers, we model hydrodynamic systems to assess overall capability under operational and extreme environmental conditions. We present the assessment of these systems in detailed design reports, sufficient for approval by third party approval and classification bodies. There are a number of stages in the modelling process:
- Basis of Design
- Hydrostatic Analysis
- Hydrodynamic Analysis
- Mooring System Modelling
- Cable/Umbilical System Modelling
- Installation & Operations
![Tadek-Services-FOW-Floating-Systems-Design-Floating-System-Modelling FOW Floating Systems Design, Floating System Modelling](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Services-FOW-Floating-Systems-Design-Floating-System-Modelling.jpg)
![Tadek-Services-FOW-Floating-Systems-Design-FOW-System FOW Floating Systems Design, FOW System Design](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Services-FOW-Floating-Systems-Design-FOW-System.jpg)
FOW System Design
Tadek naval architects combine hydrostatic and structural analysis for FOW technology and site developers answers to key questions like:
- Relationship between FOWT power scaling to structural mass scaling?
- Performance comparison between FOWT archetypes?
- How is size affected by Hs?
- Can draft be optimised for hydrodynamic performance and to meet Assembly & O&M requirements?
FOW System Design
Tadek naval architects combine hydrostatic and structural analysis for FOW technology and site developers answers to key questions like:
- Relationship between FOWT power scaling to structural mass scaling?
- Performance comparison between FOWT archetypes?
- How is size affected by Hs?
- Can draft be optimised for hydrodynamic performance and to meet Assembly & O&M requirements?
![Tadek-Services-FOW-Floating-Systems-Design-FOW-System FOW Floating Systems Design, FOW System Design](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Services-FOW-Floating-Systems-Design-FOW-System.jpg)
FOW Mooring Design
Tadek naval architects develop models for a range of FOW archetypes and environments.
- How does layout, cost and risk change from 70m to 500m WD and beyond?
- What is the impact of traditional and innovative materials/device properties?
- Mooring system installation feasibility, process and cost
![Tadek-Services-FOW-Floating-Systems-Design-FOW-Mooring FOW Floating Systems Design, FOW Mooring Design](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Services-FOW-Floating-Systems-Design-FOW-Mooring-1.jpg)
FOW Mooring Design
Tadek naval architects develop models for a range of FOW archetypes and environments.
- How does layout, cost and risk change from 70m to 500m WD and beyond?
- What is the impact of traditional and innovative materials/device properties?
- Mooring system installation feasibility, process and cost
![Tadek-Services-FOW-Floating-Systems-Design-FOW-Mooring FOW Floating Systems Design, FOW Mooring Design](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Services-FOW-Floating-Systems-Design-FOW-Mooring-1.jpg)
![Tadek-Services-FOW-Floating-Systems-Design-Dynamic-Cable-Umbilical-System FOW Floating Systems Design, Dynamic Cable Umbilical System Design](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Services-FOW-Floating-Systems-Design-Dynamic-Cable-Umbilical-System.jpg)
Dynamic Cable & Umbilical System Design
Experiences in both high value, high risk O&G umbilical design for permanent works, as well as floating MRE and FOW are combined within in-house tools to carry out dynamic system analysis for any cable, umbilical or riser system, resulting from vessel motion, waves and current.
Tadek have experience designing dynamic cable systems for FOW. Various configurations (e.g. lazy, pliant, steep wave, etc.) are assessed from platform to seabed, as well as IAC routing, to present operational, cost and risk analysis, as well as answering questions such as: how is fatigue life impacted by configuration selection?
The work includes cross-section design supported by an in-house software (PreCAB) . PreCAB utilises well established equations and industry standards to deliver a cross section design sufficient and valid for FEED design and project cost estimation prior to more detailed cable manufacturer data.
Dynamic Cable & Umbilical System Design
Experiences in both high value, high risk O&G umbilical design for permanent works, as well as floating MRE and FOW are combined within in-house tools to carry out dynamic system analysis for any cable, umbilical or riser system, resulting from vessel motion, waves and current.
Tadek have experience designing dynamic cable systems for FOW. Various configurations (e.g. lazy, pliant, steep wave, etc.) are assessed from platform to seabed, as well as IAC routing, to present operational, cost and risk analysis, as well as answering questions such as: how is fatigue life impacted by configuration selection?
The work includes cross-section design supported by an in-house software (PreCAB) . PreCAB utilises well established equations and industry standards to deliver a cross section design sufficient and valid for FEED design and project cost estimation prior to more detailed cable manufacturer data.
![Tadek-Services-FOW-Floating-Systems-Design-Dynamic-Cable-Umbilical-System FOW Floating Systems Design, Dynamic Cable Umbilical System Design](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Services-FOW-Floating-Systems-Design-Dynamic-Cable-Umbilical-System.jpg)
Floating System Installation Design
Tadek analysts and project engineers work together to optimise designs for optimal and efficient hook-up of a range of assets, amongst them FOWTs, FPSOs, and floating MRE.
These solutions are born from a range of practical offshore experiences hooking up a range of assets.
The team can therefore both engineer and develop various procurement and operational deliverables to enable a complete picture of the system and resulting costs and risks.
![Tadek-Services-FOW-Floating-Systems-Design-Floating-System-Installation FOW Floating Systems Design, Floating System Installation](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Services-FOW-Floating-Systems-Design-Floating-System-Installation-1.jpg)
Floating System Installation
Tadek analysts and project engineers work together to optimise designs for optimal and efficient hook-up of a range of assets, amongst them FOWTs, FPSOs, and floating MRE.
These solutions are born from a range of practical offshore experiences hooking up a range of assets.
The team can therefore both engineer and develop various procurement and operational deliverables to enable a complete picture of the system and resulting costs and risks.
![Tadek-Services-FOW-Floating-Systems-Design-Floating-System-Installation FOW Floating Systems Design, Floating System Installation](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Services-FOW-Floating-Systems-Design-Floating-System-Installation-1.jpg)
Our Clients
![Tadek-Client-Ocean-Winds Ocean Winds](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Client-Ocean-Winds.jpg)
![Tadek-Client-Orsted Orsted](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Client-Orsted-1.jpg)
![Tadek-Client-RWE RWE](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Client-RWE.jpg)
![Tadek-Client-Vattenfall Vattenfall](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Client-Vattenfall.jpg)
![Tadek-Client-Shell Shell](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Client-Shell-1.jpg)
![Tadek-Client-Saipem Saipem](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Client-Saipem.jpg)
![Tadek-Client-NSea NSea](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Client-NSea.jpg)
![Tadek-Client-Deme Deme](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Client-Deme.jpg)
![Tadek-Client-Maersk Maersk Supply Service](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Client-Maersk.jpg)
![Tadek-Client-FMS FSM First Marine Solutions](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Client-FMS.jpg)
![Tadek-Client-Trelleborg Trelleborg](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Client-Trelleborg.jpg)
![Tadek-Client-Marine-Power-Systems Marine Power Systems](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Client-Marine-Power-Systems.jpg)
![Tadek-Client-Magallanes-Renovables Magallanes Renovables](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Client-Magallanes-Renovables.jpg)
![Tadek-Client-Total-Energies Total Energies](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Client-Total-Energies-1.jpg)
![Tadek-Client-Minesto Minesto](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Client-Minesto-1.jpg)
![Tadek-Client-Houlder Houlder](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Client-Houlder.jpg)
![Tadek-Client-Acteon Acteon](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Client-Acteon.jpg)
![Tadek-Client-Utility-ROV-Services Utility ROV Services](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Client-Utility-ROV-Services-1.jpg)
![Tadek-Client-IQIP IQIP](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Client-IQIP-1.jpg)
![Tadek-Client-McLH McL&H](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Client-McLH.jpg)
![Tadek-Client-ode Ode](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Client-ode.jpg)
![Tadek-Client-Technalia Technalia](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Client-Technalia.jpg)
![Tadek-Client-Wood Wood](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Client-Wood.jpg)
![Tadek-Client-RCG RCG](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Client-RCG.jpg)
![Tadek-Client-Prysmian-Group Prysmian Group](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Client-Prysmian-Group.jpg)
![Tadek-Client-Ocean-Winds Ocean Winds](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Client-Ocean-Winds.jpg)
![Tadek-Client-Orsted Orsted](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Client-Orsted-1.jpg)
![Tadek-Client-RWE RWE](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Client-RWE.jpg)
![Tadek-Client-Vattenfall Vattenfall](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Client-Vattenfall.jpg)
![Tadek-Client-Shell Shell](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Client-Shell-1.jpg)
![Tadek-Client-Saipem Saipem](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Client-Saipem.jpg)
![Tadek-Client-NSea NSea](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Client-NSea.jpg)
![Tadek-Client-Deme Deme](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Client-Deme.jpg)
![Tadek-Client-Maersk Maersk Supply Service](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Client-Maersk.jpg)
![Tadek-Client-FMS FMS First Marine Solutions](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Client-FMS.jpg)
![Tadek-Client-Trelleborg Trelleborg](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Client-Trelleborg.jpg)
![Tadek-Client-Marine-Power-Systems Marine Power Systems](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Client-Marine-Power-Systems.jpg)
![Tadek-Client-Magallanes-Renovables Magallanes Renovables](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Client-Magallanes-Renovables.jpg)
![Tadek-Client-Total-Energies Total Energies](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Client-Total-Energies-1.jpg)
![Tadek-Client-Minesto Minesto](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Client-Minesto-1.jpg)
![Tadek-Client-Houlder Houlder](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Client-Houlder.jpg)
![Tadek-Client-Acteon Acteon](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Client-Acteon.jpg)
![Tadek-Client-Utility-ROV-Services Utility ROV Services](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Client-Utility-ROV-Services-1.jpg)
![Tadek-Client-IQIP IQIP](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Client-IQIP-1.jpg)
![Tadek-Client-McLH McL&H](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Client-McLH.jpg)
![Tadek-Client-ode ode](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Client-ode.jpg)
![Tadek-Client-Technalia Tecnalia](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Client-Technalia.jpg)
![Tadek-Client-Wood Wood](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Client-Wood.jpg)
![Tadek-Client-RCG rcg](https://www.tadek.co.uk/wp-content/uploads/2023/06/Tadek-Client-RCG.jpg)